Track Clearance 2025   – click on a photo to enlarge

North Somerset Council is planning for the disused section of the line to have its vegetation kept at ground level over the summer as part of the reptile and amphibian mitigations. The low levels of vegetation also allow the engineering and ecology teams to carry out the various surveys that are required pre-construction. Enabling works on the existing bridges over the line will happen this summer as they need to be strengthened prior to the main construction activity. The bridges can be home to bats so NSC needs to ensure that they are safely relocated under licence before any works which may disturb them can commence.


Preliminary track clearance took place in 2013 – photos …


See also:

2015 photos ...

2021 photos ...

2023 photos ...

Looking towards Portishead and the approach to site of new station

Looking from Portishead towards Bristol – April 2025

Sheepway bridge looking towards Bristol – April 2025

Looking towards Portishead and the approach to site of new station

April 2025

Looking from Portishead towards Bristol – April 2025


Sheepway bridge looking towards Bristol – April 2025

Sheepway bridge looking towards Portishead – April 2025

From Sheepway bridge looking towards Portishead – April 2025

From Sheepway bridge looking towards Bristol with National Grid temporary crossing – April 2025

Sheepway bridge looking towards Portishead – April 2025

From Sheepway bridge looking towards Portishead – April 2025

From Sheepway bridge looking towards Bristol with National Grid temporary crossing – April 2025

 From Station Road bridge, Sheepway, looking towards Portishead – April 2025




From Station Road bridge, Sheepway, looking towards Portishead – April 2025